The building was completed in 2000. Vertically layered wood board siding appears on the façade, next to the wall with roughly smoothed plaster. In the loft, the slanting planes were covered in Sheetrock. In the baths the floor tiles are 10 mm thick, cut sandstone.
The garage with a retaining wall opening from the frontyard is covered by earth and it is structurally separate from the building.
An outside flight of stairs leads to the main building. The stairs are covered with custom-made concrete tiles.
The retaining walls are made of local sandstone.
Architectural design: László Vincze
Associate: Miklós Salamin
Furniture: János Sajben
Design: 1999
Completed: 2000